This was a one off clearance on Southend seafront to a rear car park area.

Whole site needed weeding, with litter, rubble and rubbish removed. We applied weedkiller across the whole site and then supplied, spread and levelled 67 tons of stone chipping.

Additionally we cleared the 3 beds which were overgrown with weeds, added 6 tons of topsoil/compost mix and then supplied and installed planting.

All done to the clients timescales and budget.

What We did:

  • Clearance of weeds and litter
  • Applied weedkiller across the whole site
  • Cleared the 3 beds which were overgrown with weeds added 6 tons of topsoil/compost mix and then supplied and installed planting.
  • Rubble and rubbish removed
  • Spread and levelled 67 tons of stone chipping